This is a rough guide to use for our shooting schedule, first filming will be on the 16th of January
|
Day/ Time
|
Location
|
Shot description
|
People Needed
|
|
Thursday
16th
Jan
(PM post 5.00)
|
Underpass,
alley, run down area (sheltered).
|
Wide
shot- tracking- mid shot- close up.
|
All
crew, specific: Protagonist & antagonist, Extras, Camera man.
|
|
Friday
17th Jan (Am during units 1&2)
|
Street, park, open
uncrowded area (Bench).
|
Overhead, over
shoulder, POV- close up (FP).
|
(Above minus
antagonist).
|
|
|
‘’
|
(Final
scene)
|
‘’ + (Extra-tramp)
|
|
Monday
20th Jan (5+6)
|
School (Interview
rooms)
|
Over shoulders- camera
circles, shot/reverse shot.
|
All crew, specific
multiple interviewers and protagonist.
|
|
|
(property
opportunity)
|
(House
scenes shooting)
|
All crew
|
|
Additional shots.
|
|||